May

DSU sensors for the Bushehr NPP were manufactured and delivered

June

Airtight Cases (in the amount of 2 pieces) for Novovoronezh Nuclear Power Plant were manufactured and delivered.
Construction, installation and commissioning works were performed on the event "Modernization of elevators" of the CCA at the Balakovo Nuclear Power Plant
switching electric drives boxes (from COTT-2) for the Belarusian Nuclear Power Plant were manufactured and supplied
Manufactured and delivered metal doors that accept air shock wave pressure, fire-resistant for buildings and structures of category I in the amount of 18 pieces for the Kursk NPP

October

Manufactured and delivered metal doors that perceive the pressure of air shock waves, fire-resistant for buildings and structures of category I in the amount of 2 pieces for Kursk NPP-2
Manufactured and delivered protective sealed metal doors with a fire resistance limit of 1.5 hours in the amount of 2 (two) pieces for Kursk NPP-2

December

Protective, sealed metal Doors with a fire resistance limit of 1.5 hours in the amount of 6 (six) pieces for Kursk NPP-2 were manufactured and delivered