June

A plug-in module AM-203 for CoreStar OMNI-200 device was supplied for JSC Atomenergoremont.
Machinery and tools were supplied for the auxiliary building of Zheleznogorsk Heat and Power Station (HPS) at the site of incomplete construction of Sosnovoborsk HPS.

July

Equipment was supplied for forge and welding shops of Zheleznogorsk HPS at the site of incomplete construction of Sosnovoborsk HPS.

Augustus

Linear modules were supplied for Uralatomenergoremont.
Equipment was supplied for machine and metalworkingshops of Zheleznogorsk HPS at the site of incomplete construction of Sosnovoborsk HPS.
Transformer substation was supplied for FSUE Zababakhin Russian Research Institute for Technical Physics.

September

Equipment was supplied for electrical repair and charging shops and warehouse as well of Zheleznogorsk HPS at the site of incomplete construction of Sosnovoborsk HPS.
Transformer substation was supplied for PJSC Priargunsky Industrial Mining and Chemical Union.

October

Equipment was supplied for joiner’s shop and laundry of Zheleznogorsk HPS at the site of incomplete construction of Sosnovoborsk HPS.
Transformer substation was supplied for PJSC Priargunsky Industrial Mining and Chemical Union.

November

A multifrequency generator for CoreStar OMNI-200 with module AM-201 was supplied for JSC Atomenergoremont.
A software equipment for the eddy current flow detector OMNI was supplied for Uralatomenergoremont.

December

Technical assignment and working design doc-umentation drawn up, metal tissue filters for ra-dioactive argon conditioning and decay system of BN-800 were manufactured and supplied for power unit №4 of Beloyarsk NPP.