January

The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Valves and backflow valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.

February

Passenger and cargo elevators, small cargo elevators were fabricated and supplied for power unit №1 of Novovoronezh NPP-2.
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
The technical assignment drawn up and working design documentation prepared, nitrogen-oxygen plant was manufactured and supplied power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

March

The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

April

The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Metal working machinery was built and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

May

Machines (including a mobile unit for assembling/dismantling of thread connections) for the workshops with controlled access, were produced and supplied.
Heat tracing control panels were produced and supplied for power unit №4 of Beloyarsk NPP.
Heat tracing control panels were produced and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators and electrical equipment in the reactor building UBR, UJD, UJA; were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-

June

Metal working machinery was built and supplied for power unit №4 of Beloyarsk NPP.
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Valves and backflow valves were manufactured and supplied for power units №1-2 of Novovoronezh NPP-2.
Construction, installation and setting-up were carried out during replacement of the elevators in power unit №2 of Balakovo NPP.
Construction and installation, including installation of the elevators and electrical equipment in the reactor block UBR, UJD, UJA; were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800

July

Metal working machinery was built and supplied for power unit №4 of Beloyarsk NPP.
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Gate valves were made and supplied for power unit №1 of Novovoronezh NPP-2.
The technical assignment drawn up, valves and backflow valves were manufactured and sup-plied for power units №1-2 of Novovoronezh NPP-2.
Construction and installation, including installation of the elevators and electrical equipment in the reactor building UBR, UJD, UJA; were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-

Augustus

Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP.
The technical assignment drawn up, heat exchanger for emergency coolant injections was made and supplied for power unit №3 of Tianwan NPP-2.
Construction and installation, including installation of the elevators in the machinery hall UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

September

Construction, installation and setting-up were carried out during replacement of the elevators in power unit №2 of Balakovo NPP.
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP.
Butterfly valves produced and supplied for power unit №1 of Novovoronezh NPP-2.
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Machines (including an NC boring machine) for controlled access workshops, were produced and supplied for power unit №1 of Novovoronezh NPP-2.
Construction and installation, including installation of the elevators in the machinery hall UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

October

The technical assignment drawn up, regenerative heat exchanger for primary circuit blowing was made and supplied for power unit №3 of Tianwan NPP-2.
Construction, installation and setting-up were carried out during replacement of the elevators in power unit №2 of Balakovo NPP.
The technical assignment drawn up, finishing intercooler for the primary circuit blowing was produced and supplied for power unit №3 of Tianwan NPP-2.
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Construction and installation, including installation of the elevators in the machinery hall UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

November

Sumps and mud traps were produced and supplied for power unit №1 of Novovoronezh NPP-2.
Construction, installation and setting-up were carried out during replacement of the elevators in power unit №2 of Balakovo NPP.
Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (administrative and laboratory block) block of power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the power distribution block UBA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.

December

The technical assignment drawn up, operative communication system was produced and supplied for power unit №4 of Beloyarsk NPP.
A prefabricated cabin transformer substation with two transformers was produced and supplied for Omsk transmission line.
Construction, installation and setting-up were carried out during replacement of the elevators in power unit №2 of Balakovo NPP.
Cable laying and conduit installation were car-ried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
The technical assignment drawn up, finishing evaporator was produced and supplied for power unit №3 of Tianwan NPP-2.
Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (ad-ministrative and laboratory block) block of pow-er unit №4 of Beloyarsk NPP.