February

Machinery, metalworking and welding equipment, including balancing machine, hydraulic press and screw-cutting lathe, were supplied for power unit №4 of Beloyarsk NPP.

March

Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP.
Machinery, metalworking and welding equip-ment, including balancing machine, screw-cutting lathe and polishing-grounding machine, were supplied for power unit №4 of Beloyarsk NPP.

May

Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP.
Machinery, metalworking and welding equipment, including fully equipped modified round-drilling machine and all-purpose round-grinding machine, were supplied for power unit №4 of Beloyarsk NPP.

June

Exhaust pipes with barriers were supplied for Khiagda mine.
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP.
Working construction documentation prepared, lifting equipment, including self-propelled trol-ley, overhead underslung electric crane with in-struments; were made and supplied for power unit №4 of Beloyarsk NPP.

July

Machinery, metalworking and welding equipment, including vertical drilling machine, multipurpose milling-drilling-boring machine, floor grinding machine, multipurpose boring machine; were supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, passenger elevators with increased requirements to aesthetic features were produced and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP.
Working construction documentation prepared, lifting equipment, including self-propelled trol-ley (load-carrying capacity 1600 kg), hydraulic trolley TGR 2,5/195, small mobile portal bridge crane; were made and supplied for power unit №4 of Beloyarsk NPP.
Machinery, metalworking and welding equipment, including vertical floor drilling machine, multipurpose milling-drilling-boring machine; were supplied for power unit №4 of Beloyarsk NPP.

Augustus

Working construction documentation prepared, lifting equipment, including hand grapnel, equipment for pump station of the automated fire-fighting system, worm hand hoist; were produced and supplied for power unit №4 of Beloyarsk NPP.
An eddy current flow detector OMNI with components was supplied for Uralatomenergoremont.
Construction and installation of the inside grounding circuit were carried out at the con-struction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.

September

Working construction documentation prepared, lifting equipment, including electric hoist with instruments, electric cart EK-3, electric cart (lift-carrying capacity 2 tons), electric loader (lift-carrying capacity 2 tons); were made and supplied for power
Construction and installation of the inside grounding circuit were carried out at the construction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.

October

Machinery, metalworking and welding equipment, including fully equipped lapping machine; were supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, elevators were made and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, lifting equipment was produced and supplied for power unit №4 of Beloyarsk NPP
Construction and installation of the inside grounding circuit were carried out at the con-struction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.

November

Working design documentation prepared, eleva-tors were supplied for power unit №4 of Belo-yarsk NPP.
Stationery was supplied.
Working design documentation prepared, lifting equipment was produced and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, elevators were made and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, radioactive sodium sampling box was produced and supplied.
Machinery, metalworking and welding equipment, including tool crib with tools, storage rack for spares, billets, tools; were supplied for power unit №4 of Beloyarsk NPP.

December

Stationery was supplied for JSC Atomtehenergo.
Working design documentation prepared, passenger elevators with increased requirements to aesthetic features were produced and supplied for power unit №4 of Beloyarsk NPP.
Technical assignment and working design documentation drawn up, steam boiler E-50-3, 9-440GM was made and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, lifting equipment, including fixed pinion hand hoist, mobile worm hand hoist; were produced and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation of the inside grounding circuit were carried out at the construction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.