Airtight Cases (in the amount of 2 pieces) for Novovoronezh Nuclear Power Plant were manufactured and delivered.
April
he system of detection of secondary coolant leaks (SOT-2) for unit 2 of Novovoronezh NPP-2 was manufactured and delivered Установите приложение на смартфон и работайте офлайн Переводите в Яндекс.Браузере
October
Manufactured and supplied Sensors level switch for automated control system of technological processes for Novovoronezh NPP-2
November
Manufactured and supplied to the thermoelectric Converters and resistance Thermometers (90 pieces) for Novovoronezh NPP-2 Manufactured and supplied Alarm limit resistance СПРС2И of 323 PCs for the needs of the Novovoronezh NPP, unit 2
December
Manufactured and supplied to the thermoelectric Converters and resistance Thermometers (346 PCs) for Novovoronezh NPP-2
January
Floor drain tank and drain water pit tank were produced and supplied for power unit №1 of Novovoronezh NPP-2. The technical assignment drawn up, primary sampling system, a part of the Automated system for chemical control, was made and supplied.
February
The technical assignment drawn up, primary sampling system, a part of the Automated system for chemical control, was made and supplied for power unit №1 of Novovoronezh NPP-2. Filter holders, detection assemblies which are a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
March
Manufactured and supplied for measurement of volumetric activity of radioactive gases in the air from Automated radiation monitoring system for power unit No. 1 of Novovoronezh NPP-2. Detecter devices, processing unit and transfering data, which are a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
The technical assignment drawn up, primary sampling system, a part of the Automated sys-tem for chemical control, was made and supplied for power unit №1 of Novovoronezh NPP-2.
April
EPD readers, filter holders, protecting screen which are a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
June
The technical assignment drawn up, primary sampling system sample preparation and measurement of the purge water makeup water 1 outline of the system of automated chemical control 1 circuit for unit No. 1 of Novovoronezh NPP-2.
Augustus
The kit calibration equipment of the system of automated chemical control 1 circuit was manufactured and supplied for unit No. 1 of Novovoronezh NPP-2. The installation of the issuance of dosimeters of the system of automated chemical control 1 circuit were manufactured and supplied for unit No. 1 of Novovoronezh NPP-2.
December
Manufactured and supplied equipment for the issuance of dosimeters to BETA-480А and installing the issuance of dosimeters to BETA-100A from Automated radiation monitoring system for power unit No. 1 of Novovoronezh NPP-2 Conducted erection and commissioning of machinery equipment for Novovoronezh NPP-2
Manufactured and supplied equipment the detection unit of BDAG of composition avtomatizirovanno radiation monitoring system for Novovoronezh NPP-2 Manufactured and supplied equipment of automated control system is the Controlling point of the input/output of digital signals for power unit №1 of Novovoronezh NPP-2
January
The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2.
April
The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2. A set of temperature controllers was manufac-tured and supplied for power unit №1 of Novo-voronezh NPP-2.
The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2.
May
A set of temperature controllers was manufac-tured and supplied for power unit №1 of Novo-voronezh NPP-2.
July
The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2. Personal gamma/neutron self-reading dosimeters, personal gamma/beta self-reading dosimeters, a part of the automated system for radiation monitoring, were manufactured and supplied for power unit №1.
The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2. Control units of nuclear plant personnel contamination, a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Augustus
Detection assemblies, a part of the Automated system for radiation monitoring, were made and supplied for power unit №1 of Novovoronezh NPP-2. The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2.
Liquid scintillation alpha/beta spectrometric radiometers, a part of the Automated system for radiation monitoring, were produced and supplied for power unit №1 of Novovoronezh NPP-2.
September
Beta-ray spectrometer system, a part of the Automated system for radiation monitoring, was made and supplied for power unit №1 of Novovoronezh NPP-2.
October
Detection assemblies, dosimeters, personal digital dosimeter, all are a part of the Automated system for radiation monitoring, were fabricated and supplied for power unit №1 of Novovoronezh NPP-2.
November
Mobile radiometric units, dosimeters - radiometers, all are a part of the Automated system for radiation monitoring, were produced and supplied for power unit №1 of Novovoronezh NPP-2. Contamination control units, a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Radiometric units, radiometer, detection assem-blies, all are a part of the Automated system for radiation monitoring, were produced and sup-plied for power unit №1 of Novovoronezh NPP-2. Counting rate-meters, luminescent gamma-ray dosimetry system, all are a part of the Automated system for radiation monitoring, were produced and supplied for power unit №1 of Novovoronezh NPP-2.
A portable spectrometer, filter holders, control unit of nuclear plant personnel contamination, which is a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
December
Control units for volumetric activity of radioactive gases, a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2. Control units for volumetric activity of radioactive aerosols, radiometric units, all are a part of the Automated system for radiation monitoring, were produced and supplied for power unit №1 of Novovoronezh NPP-2.
Gamma-ray multichannel spectrometer for X-ray and gamma-ray detection, gamma-ray spectrometer, survey radiometer, all are a part of the Automated system for radiation monitoring, were produced and supplied for power unit №1 of Novovoronezh NPP-2. Reader devices, a part of the Automated system for radiation monitoring, were developed, licensed, added to the Federal register MVI and MRK (Procedure of Measurements and Methods For Radiation Monitoring) finally produced and supplied to power unit №1 o
Automated spectrometer units for reactor coolant control and detection units for inert noble gases emissions were made and supplied.
January
Valves and backflow valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
February
Passenger and cargo elevators, small cargo elevators were fabricated and supplied for power unit №1 of Novovoronezh NPP-2.
May
Machines (including a mobile unit for assembling/dismantling of thread connections) for the workshops with controlled access, were produced and supplied.
June
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2. Valves and backflow valves were manufactured and supplied for power units №1-2 of Novovoronezh NPP-2.
July
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2. Gate valves were made and supplied for power unit №1 of Novovoronezh NPP-2.
The technical assignment drawn up, valves and backflow valves were manufactured and sup-plied for power units №1-2 of Novovoronezh NPP-2.
September
Butterfly valves produced and supplied for power unit №1 of Novovoronezh NPP-2. Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Machines (including an NC boring machine) for controlled access workshops, were produced and supplied for power unit №1 of Novovoronezh NPP-2.
October
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
November
Sumps and mud traps were produced and supplied for power unit №1 of Novovoronezh NPP-2.
December
Control valves were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Augustus
Control valves were manufactured and supplied for power units №1-2 of Novovoronezh NPP-2. Containers and pallets for non-flammable gases cylinders storage were made and supplied for power unit №1 of Novovoronezh NPP-2.
September
Containers and pallets for flammable gases cylinders storage were made and supplied for power unit №1 of Novovoronezh NPP-2.
November
A system for automated chemical control of steam generator blowing systems was produced and supplied for power units №1-2 of Novovoronezh NPP-2.
December
An automated diesel-electric power unit (with engine), equipped with dual flow water cooling system, of the mechanical annex to a diesel power plant of the civil defense shelter was produced and supplied. A condensate storage tank for water purification system of the special laundry block for radioactive waste recycling and storage, a tank for preparation of sodium silicate working solution, a gauging tank for sodium silicate working solution were produced