Year
January
Construction and installation including installation of the elevators in the special sanitation block USP were carried out for the state needs under the project “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Construction and installation, including installation of the elevators in the power distribution block UBA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
March
Metal working machinery was produced and supplied for power unit №4 of Beloyarsk NPP Construction and installation including installation of elevators in the special sanitation block USP were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
April
Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
May
Construction and installation, including installation of elevators and duct banks in the special block 1UKS, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
June
Construction and installation, including installation of elevators and duct banks in the special block 1UKS, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
July
Construction and installation, including installation of elevators and duct banks in the special block 1UKS, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. The shut-off valves were made and supplied for power unit №1 of Novovoronezh NPP-2.
Augustus
Construction and installation, including installation of elevators and duct banks in the special block 1UKS, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (administrative and laboratory block) block of power unit №4 of Beloyarsk NPP.
September
Construction and installation, including installation of elevators and duct banks in the special block 1UKS, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
October
Construction and installation, including installation of elevators and duct banks in the special block 1UKS, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (ad-ministrative and laboratory block) block of pow-er unit №4 of Beloyarsk NPP.
Cable laying and conduit installation were car-ried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
November
Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (administrative and laboratory block) block of power unit №4 of Beloyarsk NPP.
January
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP. Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
February
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP. The technical assignment drawn up and working design documentation prepared, nitrogen-oxygen plant was manufactured and supplied power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
March
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP. The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
April
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP. Metal working machinery was built and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
May
Heat tracing control panels were produced and supplied for power unit №4 of Beloyarsk NPP. Heat tracing control panels were produced and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators and electrical equipment in the reactor building UBR, UJD, UJA; were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-
June
Metal working machinery was built and supplied for power unit №4 of Beloyarsk NPP. The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators and electrical equipment in the reactor block UBR, UJD, UJA; were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800
July
Metal working machinery was built and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators and electrical equipment in the reactor building UBR, UJD, UJA; were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-
Augustus
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the machinery hall UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
September
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the machinery hall UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
October
Construction and installation, including installation of the elevators in the machinery hall UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
November
Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (administrative and laboratory block) block of power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the power distribution block UBA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
December
The technical assignment drawn up, operative communication system was produced and supplied for power unit №4 of Beloyarsk NPP. Cable laying and conduit installation were car-ried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Setting-up and testing of elevator electrical equipment at no-load took place in ALBK (ad-ministrative and laboratory block) block of pow-er unit №4 of Beloyarsk NPP.
February
Construction and installation, including installation of electrical conduits in the special block 6 UKS axes 28-34, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
March
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installa-tion of electrical conduits in the special block 6 UKS axes 28-34, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
April
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the special block 1UKS axes 11-27, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
May
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installa-tion of the elevators in the special block 1UKS axes 11-27, were carried out for the state needs at the construction site “The expansion of Belo-yarsk NPP with power unit №4 and BN-800 re-actor”.
June
The technical assignment drawn up and working design documentation prepared, nitrogen-oxygen plant was manufactured and supplied power unit №4 of Beloyarsk NPP. Construction and installation, including installa-tion of the elevators in the special sanitation block UPS axes 1-10, were carried out for the state needs at the construction site “The expan-sion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
July
The technical assignment drawn up, operative communication system was produced and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installa-tion of the elevators in the special sanitation block UPS axes 1-10, were carried out for the state needs at the construction site “The expan-sion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Augustus
The technical assignment drawn up, operative communication system was produced and supplied for power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
September
The technical assignment drawn up, operative communication system was produced and supplied for power unit №4 of Beloyarsk NPP. The technical assignment drawn up and working design documentation prepared, nitrogen-oxygen plant was manufactured and supplied power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
October
Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP. Closed-Circuit Television equipment was made and supplied for power unit №4 of Beloyarsk NPP.
The technical assignment drawn up, operative communication system was produced and supplied for power unit №4 of Beloyarsk NPP. Setting-up and testing of elevator electrical equipment at no-load took place in the machinery hall of power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UMA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
November
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP. The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Cable laying and conduit installation were car-ried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Setting-up and testing of elevator electrical equipment at no-load took place in the machin-ery hall of power unit №4 of Beloyarsk NPP. Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Cable laying and conduit installation were carried out in the utility tunnel from the OVK block to ALBK, KPP blocks and to BNS station at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Setting-up and testing of elevator electrical equipment at no-load took place in the machinery hall of power unit №4 of Beloyarsk NPP.
December
Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP. The technical assignment drawn up and working design documentation prepared, NKU-0.4kV (low voltage switchgears) were produced and supplied for power unit №4 of Beloyarsk NPP.
Construction and installation, including installation of the elevators in the central block UJA, were carried out for the state needs at the construction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor Construction and installation, including installa-tion of the elevators in the central block UJA, were carried out for the state needs at the con-struction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”.
Construction and installation, including installa-tion of the elevators in the central block UJA, were carried out for the state needs at the con-struction site “The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor”. Setting-up and testing of elevator electrical equipment at no-load took place in the special sanitation block of power unit №4 of Beloyarsk NPP.
February
Machinery, metalworking and welding equipment, including balancing machine, hydraulic press and screw-cutting lathe, were supplied for power unit №4 of Beloyarsk NPP.
March
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP. Machinery, metalworking and welding equip-ment, including balancing machine, screw-cutting lathe and polishing-grounding machine, were supplied for power unit №4 of Beloyarsk NPP.
May
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP. Machinery, metalworking and welding equipment, including fully equipped modified round-drilling machine and all-purpose round-grinding machine, were supplied for power unit №4 of Beloyarsk NPP.
June
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP. Working construction documentation prepared, lifting equipment, including self-propelled trol-ley, overhead underslung electric crane with in-struments; were made and supplied for power unit №4 of Beloyarsk NPP.
July
Machinery, metalworking and welding equipment, including vertical drilling machine, multipurpose milling-drilling-boring machine, floor grinding machine, multipurpose boring machine; were supplied for power unit №4 of Beloyarsk NPP. Working design documentation prepared, passenger elevators with increased requirements to aesthetic features were produced and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, bus ducts SHZK-0.4 were produced and supplied for power unit №4 of Beloyarsk NPP. Working construction documentation prepared, lifting equipment, including self-propelled trol-ley (load-carrying capacity 1600 kg), hydraulic trolley TGR 2,5/195, small mobile portal bridge crane; were made and supplied for power unit №4 of Beloyarsk NPP.
Machinery, metalworking and welding equipment, including vertical floor drilling machine, multipurpose milling-drilling-boring machine; were supplied for power unit №4 of Beloyarsk NPP.
Augustus
Working construction documentation prepared, lifting equipment, including hand grapnel, equipment for pump station of the automated fire-fighting system, worm hand hoist; were produced and supplied for power unit №4 of Beloyarsk NPP. Construction and installation of the inside grounding circuit were carried out at the con-struction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.
September
Working construction documentation prepared, lifting equipment, including electric hoist with instruments, electric cart EK-3, electric cart (lift-carrying capacity 2 tons), electric loader (lift-carrying capacity 2 tons); were made and supplied for power Construction and installation of the inside grounding circuit were carried out at the construction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.
October
Machinery, metalworking and welding equipment, including fully equipped lapping machine; were supplied for power unit №4 of Beloyarsk NPP. Working design documentation prepared, elevators were made and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, lifting equipment was produced and supplied for power unit №4 of Beloyarsk NPP Construction and installation of the inside grounding circuit were carried out at the con-struction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.
November
Working design documentation prepared, eleva-tors were supplied for power unit №4 of Belo-yarsk NPP. Working design documentation prepared, lifting equipment was produced and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, elevators were made and supplied for power unit №4 of Beloyarsk NPP. Working design documentation prepared, radioactive sodium sampling box was produced and supplied.
Machinery, metalworking and welding equipment, including tool crib with tools, storage rack for spares, billets, tools; were supplied for power unit №4 of Beloyarsk NPP.
December
Working design documentation prepared, passenger elevators with increased requirements to aesthetic features were produced and supplied for power unit №4 of Beloyarsk NPP. Technical assignment and working design documentation drawn up, steam boiler E-50-3, 9-440GM was made and supplied for power unit №4 of Beloyarsk NPP.
Working design documentation prepared, lifting equipment, including fixed pinion hand hoist, mobile worm hand hoist; were produced and supplied for power unit №4 of Beloyarsk NPP. Construction and installation of the inside grounding circuit were carried out at the construction site «The expansion of Beloyarsk NPP with power unit №4 and BN-800 reactor” special block 6UKS axes 28-34.
December
Technical assignment and working design doc-umentation drawn up, metal tissue filters for ra-dioactive argon conditioning and decay system of BN-800 were manufactured and supplied for power unit №4 of Beloyarsk NPP.
December
Working design documentation prepared, warm car gates with rubbers were made and supplied for the machinery hall of power unit №4 of Beloyarsk NPP.